LightAce Global, Inc.
LightAce Global, Inc.Afrique du Sud · Canada · Royaume-Uni · États-Unis
Back to Leadership

Engr. Nsikak Udott

Member, Board of Advisory · Project Engineering Committee

Portrait of Engr. Nsikak Udott

MBA, P.Eng., PMP

Engr. Nsikak Udott is a professional engineer and project manager who has led commercial and industrial capital projects, overseeing scope, cost, schedule, and quality. He has directed teams across engineering, module fabrication, field installation, and change management, integrating quality, health, safety, and environmental requirements throughout delivery.

He is a co-visionary, shareholder, and board member of the WeldHouse Fabrication Yard (WHFY) FPSO oil and gas project in partnership with LightAce Energy Group. He also serves in a non-executive advisory role with LightAce Energy Group.

He is a professional engineer (P.Eng.) and a certified Project Management Professional (PMP). He earned an MBA specializing in Oil and Gas Management from Heriot-Watt University in 2018 and holds a B.Sc. in Electrical Engineering from the University of Calgary.

Career Expertise

Construction planning and execution, supply chain and procurement, estimating and tendering, construction drawings and standards, conceptual design, front-end engineering and detailed design for oil and gas facilities, risk management, and contract administration.

Estimation and Project Engineering

He used digital takeoffs from issued-for-construction architectural drawings and managed labor, equipment, and materials on projects for clients including Fluor Canada, PCL, and Canada Malting. He led development of a React-based mobile coatings estimator and introduced sales prospecting processes that doubled year-over-year revenue.

Quality Assurance and Field Engineering

On Imperial Oil/ExxonMobil’s Kearl Expansion Project in Fort MacKay, Alberta, he led more than 120 installers fitting multilayer insulation on pipes and equipment at the bitumen froth treatment facility. He tracked installed quantities against labor hours, performed earned value analyses, and developed 30- and 90-day schedules to address potential delays.